greetings,
cp 5.5
i've recoreded training , assessment simulation slides' timing set 3 sec. post-production: want change of slides' timing 2 sec.
i realize should have done in global prefs default prior recording. going in prefs , trying change slide duration post-production not work.
is there way without having change each slide individually?
much thanks!
k
no, not know such work flow, , think cause lot of issues. if have interactive objects, changing slide duration change active/inactive parts, if have effects duration changed relatively, if have audio, cut off etc...
is there particular reason why want this? perhaps decrease little bit filesize? object default timeline 3secs, decrease slide duration you'll first have decrease object timelines or attach them end of slide (ctrl-e). if there no real staggering in objects fastest way (but still slide/slide:
- look object of each style/type, , set timeline 2sec, can use small curved arrow in top right of timing accordion apply objects of style/type
- then slide/slide select slide timeline , use shortcut shift-ctrl-left decrease length 1sec
lilybiri
More discussions in Adobe Captivate
adobe
Comments
Post a Comment